Vantage Lighthouse Wisconsin AI Data Center Build
Vantage Lighthouse in Port Washington is a $15B+ AI data-center campus with 902 MW of critical IT load, named general-contractor evidence, and major low-voltage package signals still ahead.
Jun 24, 2026
Chevron Microsoft Pecos AI Data Center
Project Kilby pairs a Microsoft-operated Pecos AI data-center campus with Chevron-backed dedicated power, creating a major West Texas low-voltage watch item.
Jun 23, 2026
SB Energy PORTS Ohio AI Data Center
SB Energy and SoftBank's PORTS Technology Campus is a power-first Ohio AI/data-center signal with 10 GW campus framing, AEP transmission work, and specialty LV packages still unnamed.
Jun 22, 2026
Oracle Project Jupiter Dona Ana AI Campus
Oracle, BorderPlex, STACK, Bloom, and Dona Ana County sources show an active New Mexico AI data-center campus where power, workforce, and LV package signals are forming.
Jun 21, 2026
Microsoft La Porte Indiana Data Center Campus
Microsoft's La Porte campus has moved from announcement to construction, with a June 17 groundbreaking, Walsh construction-partner evidence, a 17-building expansion path, and specialty low-voltage packages still unnamed.
Jun 20, 2026
Microsoft Alviso San Jose AI Data Center Campus
Microsoft’s Alviso campus adds a source-backed San Jose AI/cloud data-center construction signal with HITT, 48 MW current coverage, and a 99 MW public-record power envelope.
Jun 19, 2026
Amazon Project Green Montgomery County Data Center Campus
Amazon Project Green adds a separate $10B Montgomery County data-center campus next to Missouri’s growing New Florence corridor, with power, water, workforce, and low-voltage package signals to monitor.
Jun 18, 2026
Google Jackson County Alabama Data Center Expansion
Google is putting $1.5B into its Jackson County, Alabama data-center campus across 2026 and 2027, with power, workforce, and low-voltage signals worth tracking.
Jun 17, 2026
Meta El Paso Project Seafox AI Data Center
Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.
Jun 16, 2026
Meta Lebanon Indiana AI Data Center Campus
Meta, Turner, Mortenson, and FTI have a source-backed 1GW AI data-center campus underway in Lebanon, Indiana, with low-voltage package signals still developing.
Jun 15, 2026
CloudBurst San Marcos AI Data Center
CloudBurst's Central Texas AI/HPC campus now has source-backed power, county approval, fiber context, and unnamed low-voltage packages.
Jun 13, 2026
OpenAI Stargate Freebird Milam County AI Data Center
TDLR records show a $470M Freebird data-center phase in Milam County, while SB Energy and OpenAI place it inside a broader 1.2 GW Stargate site.
Jun 12, 2026
Prime Lockhart AUS01 Data Center Watch
TDLR registered Prime Data Center AUS-01/AUS02 in Lockhart as a $400M two-building shell project tied to Prime's 384 MW Austin campus.
Jun 11, 2026
CyrusOne Freestone AI Data Center Low-Voltage Watch
CyrusOne has broken ground on a Freestone County, Texas AI data-center campus tied to a 380 MW plus 380 MW Constellation/Calpine power path.
Jun 10, 2026
Aligned Caprock Hale County AI Data Center Watch
Aligned Project Caprock is a 540 MW AI data-center campus under construction near Abernathy, Texas, creating a watch window for power, fiber, low-voltage, security, controls, and commissioning packages.
Jun 9, 2026