Amazon Project Eagle Boling Data Center Watch
Amazon Project Eagle in Boling, Texas has four TDLR data-center filings totaling about 756,240 square feet and $1.2B in estimated building value, with Gensler named as design firm and specialty package names still open.
Jul 10, 2026
$62.1M Sutter Health Sports Medicine Complex in Sacramento Needs 5 Low Voltage Systems
Permit records show a $62.1M build-out of Sutter Health's new Advanced Orthopedics & Sports Medicine Care Complex at 660 J Street in downtown Sacramento, requiring five low voltage systems including nurse call, clinical AV, and security, with an estimated $3.7M in LV work. Here's what low voltage contractors need to know.
Jul 9, 2026
Meta Sturgeon County AI Data Centre Watch
Meta Sturgeon County is a 1GW Canadian AI data-centre watch with Pembina Greenlight power context and unresolved specialty package names.
Jul 9, 2026
$25B Vantage Frontier AI Data Center in Texas Needs 10 Low Voltage Systems
Vantage Data Centers' Frontier — a $25B, 1.4 GW Oracle-OpenAI Stargate AI data center near Abilene, TX and the largest campus in Vantage's global portfolio — requires ten low voltage systems with an estimated campus-wide LV opportunity approaching $1 billion. Here's what low voltage contractors need to know.
Jul 8, 2026
Galaxy Helios Phase 2 Low-Voltage Watch
Galaxy Helios Phase II has CoreWeave capacity, TDLR filings, Stantec named, and unresolved specialty low-voltage package names.
Jul 8, 2026
$36M Atlanta Botanical Garden Expansion Needs 7 Low Voltage Systems
Permit records show a $36M expansion of the Atlanta Botanical Garden — part of a $160M Beltline-facing capital campaign — requiring seven low voltage systems including AV, security, and building automation, with an estimated $2.5M in LV work. Here's what low voltage contractors need to know.
Jul 7, 2026
TeraWulf Justified Data AI Campus Low-Voltage Watch
TeraWulf's Justified Data campus in Hawesville has a source-backed Anthropic lease, 401 MW critical IT load, and unresolved specialty package names.
Jul 7, 2026
Google Akransas AI Data Center Low-Voltage Watch
Google's West Memphis data center is a source-backed Arkansas AI infrastructure project with Entergy power context and low-voltage package names still unresolved.
Jul 6, 2026
LVN Signal Now Tracks Fresno, California: Real-Time Construction Intelligence for Low Voltage Contractors
Fresno, California is now live on LVN Signal. Low voltage contractors in the Fresno metro now have real-time construction intelligence covering 1,770+ active projects, with 84 new this week — just as Dodge forecasts Fresno construction starts to climb 20% in 2026.
Jul 6, 2026
$10B Meta Hyperion AI Data Center in Louisiana Needs 10 Low Voltage Systems
Meta's Hyperion — its largest data center to date, a $10B, 4 million-square-foot AI campus in Richland Parish, Louisiana — requires ten low voltage systems with an estimated $400 million in LV and structured infrastructure work. Here's what low voltage contractors need to know.
Jul 6, 2026
Airport Security Upgrade: Genetec Unifies 64 Cameras & Access
Southwest Wyoming Regional Airport replaced legacy systems with Genetec Security Center during a $43M modernization—64 cameras, 22 doors, 130+ sensors on one platform.
Jul 6, 2026
Ubiquiti AI Multi Sensor 2: Dual-Lens PoE+ Camera Review
The $699 AI Multi Sensor 2 delivers 16MP dual-lens coverage with PoE+ power. Here's what low voltage contractors need to know about camera count and design.
Jul 6, 2026
Ubiquiti Enterprise Firewall Core: 100G UniFi for Enterprise
The new Enterprise Firewall Core delivers 100 Gbps routing, 79 Gbps IDS/IPS, and 22,500+ client capacity. Here's what LV contractors need to know about UniFi's enterprise push.
Jul 5, 2026
$20.5M LAX Tom Bradley Terminal Package Needs 5 Low Voltage Systems
A $20.5M renovation package at LAX's Tom Bradley International Terminal — part of LAWA's $1.6B refresh ahead of the 2028 Olympics — requires five low voltage systems including aviation security, public address, and flight-information displays, with an estimated $1.4M in LV work. Here's what contractors need to know.
Jul 5, 2026
Homer City AI Data Center Build: Low-Voltage Watch
Homer City Energy Campus is now an active Pennsylvania AI/HPC data-center construction watch with Kiewit as EPC lead and low-voltage package names still unresolved.
Jul 5, 2026