PowerBridge Alpha Reeves County Data Center Watch
PowerBridge Alpha Digital Campus gives LVN a Reeves County, Texas powered-campus watch lane with a planned 2 GW scale, a 300+ MW first generation phase, and open specialty packages.
Jul 24, 2026
$30.7M Connect Albuquerque Edge Data Center Needs 5 Low Voltage Systems
Oppidan's $30.7M Connect Albuquerque edge data center in the Westpointe 40 Business Park needs 5 low voltage systems — structured cabling, fiber, access control, CCTV, and DAS — with an estimated $2.8M in LV work plus multi-tenant fit-out bays to follow.
Jul 23, 2026
Menlo MD-VA3 Petersburg Data Center Watch
Menlo Digital MD-VA3 gives LVN a Petersburg, Virginia AI data-center watch lane with 1.18M sq ft, 208 MW critical IT power, and open specialty packages.
Jul 23, 2026
Google Project Tembo Cheyenne Data Center Watch
Google / Jupiter Star Project Tembo gives LVN a Cheyenne AI data-center watch lane with 3.08M sq ft, 2.7GW power-hub context, and open specialty packages.
Jul 22, 2026
$1.2B Amazon Project Eagle Data Center Campus Needs 10 Low Voltage Systems
TDLR filings confirm Amazon's $1.2B Project Eagle — four data center buildings on 2,700 acres in Wharton County, TX, starting August 2026 — requiring 10 low voltage systems with an estimated $48M in LV work. No contractors named yet.
Jul 21, 2026
QTS Hall County AI Data Center Watch
QTS and Lancium's Hall County campus brings a $10B-plus AI data-center watch lane near Turkey, Texas, with a 1GW campus interconnect context and open specialty packages.
Jul 21, 2026
LVN Signal Now Tracks San Jose, California: Real-Time Construction Intelligence for Low Voltage Contractors
San Jose, California is now live on LVN Signal. Low voltage contractors in Silicon Valley now have real-time construction intelligence covering 1,500+ active projects worth $1.9B+ — just as San Jose races to become the West Coast's data center capital.
Jul 20, 2026
$7.5M Pinnacle Dermatology Clinic in Little Rock Needs 5 Low Voltage Systems
Pinnacle Dermatology is building a $7.5M, 21,362 sq ft flagship clinic at 1200 Rahling Rd in west Little Rock — requiring 5 low voltage systems with an estimated $450K in LV work across the clinic fit-out and medical tenant shell space.
Jul 20, 2026
BT Gateway Royse City Data Center Watch
BT Gateway is a $384M, 100,000 sq ft Hunt County data-center filing with open low-voltage package names.
Jul 20, 2026
$3B Rowan Project Temple Data Center Campus Needs 10 Low Voltage Systems
Rowan closed nearly $3B in green financing for Project Temple, a 300 MW turnkey hyperscale campus in Temple, TX — a 1M sq ft first building under construction, requiring 10 low voltage systems with an estimated $120M in LV work. LV packages not yet awarded.
Jul 19, 2026
CyrusOne SAT14A Castroville Data Center Watch
CyrusOne SAT14A is a $500M, 460,000 sq ft Castroville data-center filing with CyrusOne LP as owner and Corgan as design firm.
Jul 19, 2026
$4.5M Palo Alto College Veterans Center in San Antonio Needs 7 Low Voltage Systems
A $4.5M ground-up Veterans Center at Alamo Colleges' Palo Alto College campus in San Antonio requires 7 low voltage systems with an estimated $270K in LV work — the latest step in the district's campus-by-campus veterans facility buildout.
Jul 18, 2026
Vantage TX22 San Antonio Data Center Watch
Vantage TX22 is a $272.15M, 214,526 sq ft San Antonio data-center filing with Retained Vantage as owner and Corgan as design firm.
Jul 18, 2026
$3.5B Galaxy Helios Phase 2 AI Data Center Expansion Needs 10 Low Voltage Systems
Galaxy filed $3.5B in permits for Helios Phase 2 in Dickens County, TX — three buildings, 1M+ sq ft at a former bitcoin mine turned CoreWeave AI campus, requiring 10 low voltage systems with an estimated $140M in LV work. LV packages not yet awarded.
Jul 17, 2026
Microsoft SAT82 Castroville Data Center Watch
Microsoft's SAT82 filing at 18844 FM 1957 in Castroville gives LVN a source-backed Medina County data-center watch: $482.6M, 244,676 sq ft, Microsoft as owner, WSP as design firm, and open specialty low-voltage package names.
Jul 17, 2026